Leaks (0)
Notes (1)
Fittings (2)
| <all other values> |
| Overpass |
Gas Valves (3)
| <all other values> |
| ABIP |
| Bypass |
| Critical 1yr Insp |
| Excess Flow Valve |
| Inline Valve |
| Isolation |
| Purge |
| Relief |
| Service valve |
| Undefined |
Service Valves (4)
Gate Stations (5)
Interconnect (6)
Meter Setting (7)
Regulator Stations (8)
| <all other values> |
| <Null> |
| 1 |
| 2 |
Locate Stations (9)
Test Stations (10)
CP Anodes (11)
CP Rectifiers (12)
CP Rectifier Test Stations (13)
| Yes |
| No |
Gas Odorization Test Points (14)
CP Galvanic Test Stations (15)
Service Lines (16)
| <all other values> |
| Underground House Piping |
| Removed |
| Planned |
| InActive |
| Active |
| Abandoned Inplace |
| Abandoned Grouted |
Gas Main (17)
NPMS Active Transmission Lines (18)
Transmission Main (19)
Gas Pipe Casing (20)
CP Rectifier Main (21)
LP Tanks (22)
| ACTIVE |
LP Main (23)
LP Service Lines (24)
| <all other values> |
| Removed |
| Planned |
| InActive |
| Active |
| Abandoned Inplace |
| Abandoned Grouted |
LP Bulk Tanks (25)
|